Air-to-water heat pump installation details
The standard installation price for an air-to-water heat pump (€1,290) includes the following:
- Transport of the device to the site
- Consumables for standard installation
- Device startup and consultation
- Piping between the indoor and outdoor units up to 10 m
- Installation of the outdoor unit on a ground frame
- Drilling of one hole up to Ø70 mm in an external wall up to 60 cm thick
- Trunking and flexible hose to cover the refrigerant piping up to 3 m
- Installation of heating piping in the technical room
- Expansion tank – 1 unit up to 18 l (for sets with a domestic hot water boiler)
- Filling of the heating system
- Bringing the power supply to the device (up to 5 m)
The standard installation price does not include:
- Frost-proof drainage
- Concrete base plate under the outdoor unit
- External additional electrical work and accessories for the heat pump
- Dismantling and disposal of the old system
- Project documentation and as-built drawings
- Domestic hot water boiler and accumulation tank with installation
Estimated prices for additional work
Electrical panel for connecting the air-to-water heat pump – from €200
Boiler installation with accessories (does not include the boiler) – from €700
Accumulation tank installation with accessories (does not include the tank) – from €400
Circulation pump installation with accessories (does not include the pump) – from €100
Underfloor heating manifold installation – from €100
Air-to-air heat pump installation details
The standard installation price for an air-to-air heat pump (from €400) includes the following:
- Installation of the indoor unit
- Installation of the outdoor unit on a wall frame at a height of up to 2 m from the ground
- Connecting pipe and electrical cable between the indoor and outdoor units up to 6 m
- Wall mounting for the outdoor unit and rubber bushings
- Plastic cover for pipes/cables (trunking) up to 2 m
- Penetration of one wall (up to 60 cm thick)
- Bringing the power supply to the device (up to 4 m)
- Device startup and consultation
The standard installation price does not include:
- Concrete base plate under the outdoor unit
- Ground frame
- Longer piping and trunking
- Installation of a circuit breaker and power cable connection in the electrical panel
- Dismantling and disposal of the old device
- Project documentation and as-built drawings
- General construction work
- Addition of refrigerant
- Use of a lift
- Condensate pump and connection to the sewage system
